Case Studies

concrete installations

Golf Residential – Bath

Golf Course Road is a residential property over three storeys and situated in the heart of Bath. The large open plan design called for ComFlor 225 decking, which has the capability of spanning up to 6.5m unpropped. Using CF225, the architects were able to offer open plan living space, with minimal steel columns.

 

Case Study – Bath

london7

William Hare – Wallbrook

A major construction project by any standard, Bloomberg features over 77,000m² of TATA Comflor 51+, TATA Comflor 60 and TATA Comflor 80 over nine floors. The development of the building comprises two office buildings, ground floor retail units and a new entrance to the London Underground.

 

Case Study – William Hare

weston

Weston Pier

Victorian Building Weston Grand Pier is a historical and iconic landmark of Britain. Sadly burnt down in 2008 and re-developed to a new modern structure. Re-designed grand Pier is laid out over two main floors, comprising world class amusement rides and attractions, with a third floor comprising function rooms, offices, event and conferencing space.

 

Case Study – WSM Pier

IMG_1214

Atherton Leisure Centre

Atherton Leisure Centre is a re-development, demolishing the existing structure, and replacing it with a modern and accessible centre. The project consists of a 25m main swimming pool, a 20m pool, gym and fitness studios, crèche, play area and café. Atherton Leisure Centre will also feature the latest combined heat and power system, turning waste heat into electricity to power the centre.

 

Case Study – Atherton Leisure Centre